The drywall is done; the walls are primed and we are on to the fun part now. Justin and I donned our painting outfits this weekend and broke out the old paintin' tools. Justin rolled and I cut-in and we were able to finish 1.5 rooms and a closet in one day. On the second day, we were a little less productive. Most of the day was spent chasing cracks in the concrete floor with a grinder so we can fill them in with an epoxy and hopefully get a smoother floor to paint. While Justin worked with the epoxy, I wired up all of the outlets in the tool room. Justin installed the trim for the recessed lights and wired up the light in the closet.

This room just needs some concrete patching, some paint on the floor and some baseboard trim and it will be done. The nice cozy gray that we have in our bedroom is on the walls in this room.

On Sunday afternoon, we knocked off some more wall painting: the stairwell and new pantry. We opted to paint the pantry and the wall adjacent to the kitchen the blue that is in the kitchen. Presumably, you'll be able to see this area from within the kitchen and painting it the same color gives a nice continuity.

A rare action shot: me painting.

Here's one tube worth of epoxy in the cracks in our storage room. It looks like we'll be using about 4-5 of these $30 tubes to get this job done.

We will be prepping the floors for paint this next week and hopefully installing base trim soon too. Once these 2 rooms are completed, we are going to be able to move all of our stuff back into the basement!