We worked on the upstairs bathroom tile for about 12 hours yesterday which is about as much tedium as we could take. Eating pizza made by someone else at 9:30 at night after a long day like that is awesome.
Today we slept in (also awesome), dropped off a whole truckload of cardboard at the transfer station, sanded some molding, sealed the grout and caulked the downstairs shower, grouted a bit of the upstairs shower tile for the last of the plumbing fixture install tomorrow and re-installed the microwave (long story but this time it was done on the first try). Laura wrapped up the pull and knob installation and then we both did a big cleanup of the place. I have scheduled the last of the inspections for tomorrow morning and we want the place to look move in ready. I think we are there so wish us luck!
Here are some pictures of the kitchen (with knobs!):
1 comment:
Looks awesome!!!! Congrats on passing the inspection today too!