...and headin' for home! Literally. We are officially six days away from moving into our project and it is frankly, a bit scary. The big news of the weekend was that we passed the final plumbing inspection on Friday. Laura spent the day waiting around for a 90 second visit. Annoying but one less hoop to clear.
We worked on the upstairs bathroom tile for about 12 hours yesterday which is about as much tedium as we could take. Eating pizza made by someone else at 9:30 at night after a long day like that is awesome.
Today we slept in (also awesome), dropped off a whole truckload of cardboard at the transfer station, sanded some molding, sealed the grout and caulked the downstairs shower, grouted a bit of the upstairs shower tile for the last of the plumbing fixture install tomorrow and re-installed the microwave (long story but this time it was done on the first try). Laura wrapped up the pull and knob installation and then we both did a big cleanup of the place. I have scheduled the last of the inspections for tomorrow morning and we want the place to look move in ready. I think we are there so wish us luck!
Here are some pictures of the kitchen (with knobs!):
Subscribe to:
Post Comments (Atom)
1 comment:
Looks awesome!!!! Congrats on passing the inspection today too!
Post a Comment