Narrowing the Gap

For those of you who don't know, I sold my house and the deal is closing at the end of March so we have our move-in date: March 28. I have the U-Haul rented and even a few boxes packed. This news made progress this weekend all the more important as we don't have much time left before we make this place our home.

On Tuesday last week, our cabinets were delivered and our top priority this weekend was to get them installed so that the countertop templating crew can get our countertops crafted. Justin spent most of his evenings last week setting and leveling the cabinets so we thought that we'd have loads of time to work on things like painting and pulling staples from the floor this weekend. Unfortunately, he must have picked the easiest cabinets to install last week because it took the entire day Saturday to install the rest of the kitchen cabinets. We were there until 8 pm finishing the job. But they look great:

Here's our newly painted kitchen with our white cabinetry.

Here's Justin installing a base for the tall cabinets. This is our new pantry.
On Sunday, we made our way over to the house bright and early, despite our long day on Saturday. On the agenda was painting and installing the cabinetry for the upstairs bathroom.

We spent the morning spraying on the tan paint for the hallways, stairway, bathroom and extra bedroom. There was a lot of surface area and with my faulty wrist it was going to be worth it to tape off the ceilings and spray on the tan paint. We had two coats on by noon and the sprayer cleaned up too. It was a huge time/joint saver. The only bummer was that the tape took off a bunch of the ceiling paint so I'll have to go back over the edges with more ceiling paint at a later date. We got nice clean lines between the ceiling and wall though.

Here's our nook upstairs for a desk with tan paint and white ceilings.
While Justin worked on the cabinets, I decided to edge the living room and downstairs bedroom with paint. I had some extra time and will so I rolled on the paint for the bedroom. It is sort of a light blue and is exactly the same color as I have in my current spare bedroom...no need to change all of the accessories just because we're moving!

The spare room with light blue paint. The masked off stuff is a picture rail that we'll paint white eventually along with all of the rest of the molding and trim throughout the house.


I also wrapped up the painting the dining room (imagine white molding).

And Justin finished up the cabinetry in the bathroom. Isn't it sleek? (And doesn't our camera lens need a good cleaning?) I'm not so sure I'm in love with the wall color. I'm thinking I should have gone with a lighter color but we'll be giving it a chance.

Thursday, January 8, 2009

Progress-A-Plenty

There has been much progress these past few days and the week is not even over. The framers did wrap up everything they could this morning and are awaiting their last trip prior to being completely done. I released the electrician yesterday and the drywaller today. We still need to select an insulator which we will probably do after an on site meeting next week. The plumber starts tomorrow which is great as that gives him a head start on the electricians who are scheduled for next Wednesday.

Laura and I stopped at the house tonight to take more pictures, to measure for the cabinets and to see how our dream is coming together. It is good that we did check the framing dimensions against the casework shop drawings as we had two dimension issues that would have been tragic had they made it through production. A quick call to the cabinet shop and they were fixed. Apparently one of the solutions was to give me smaller bathroom drawers. Hmmmm, not sure how I feel about that.


We spent part of last night and tonight looking at tile and hardwood flooring in an attempt to narrow the field of possibilities. I think (don't quote me) that we are close on the upstairs bathroom tile but still a ways away from making a decision on hardwood flooring. Any opinions on this set of tile? We are thinking that the floor would be a 12"x24" of the brown on the lower right and the walls would be a 10"x 13" of the cream that is the same color as the large tile on the board along with some type of glass accent tile. Do any of our readers have a comment?


Laura also determined that our previously reported gas meter troubles are not nearly the magnitude that we had feared. Puget Sound Energy plans to add a line for our neighbor and then replace our meter with one of greater capacity. This is a much better deal for us.

Here are some more progress photos from yesterday and today:

The main floor hallway coat closet.

The main floor bathroom medicine cabinet will go here.

Looking from the kitchen into the dining room.

This is the same opening but from the other side.

This is the wall in the basement where all of the appliances will be roughed in (water heater, furnace, washer, dryer and utility sink).

Tuesday, January 6, 2009

Small Bad News

Laura found out some minor bad news today related to the existing natural gas service to the house. It turns out that the number of appliances we want to install will overtax the existing gas service and we will likely have problems. I guess a gas range, dryer, fireplace, furnace and instantaneous hot water heater were not thought of back in the day. Apparently what they did think of was that it would be cheaper in the short run to put in a shared gas main for our house and our neighbors so we would probably cause problems for them too. So.... it looks like we will also be getting a brand new gas main and meter for the house. I guess that is what our contingency is for (I don't know how many times I have said that lately). This is probably best in the long run as several of the electricians that looked at the house for bids said the gas and electrical meters were too close together per the current code. Our luck would probably have run out about the time we were looking for a final inspection anyway.

The day has not passed without some good news however. We met with the cabinet supplier this evening and placed our order. The framers wrapped up what they could do in the upstairs and were moving to the main floor and basement. They think they will be done tomorrow with what they can do and will have one more day to come back for some small details that will have to wait. At lunch I stopped at the house to clarify a few framing details and to meet with the newly signed up furnace guy. All systems are go on that front and they should be starting to install duct work on the 19th. It also appears that our matching vinyl siding was locally available as it was sitting on the porch ready to go. Now in six or seven more work days the windows will be ready and the whole package can go in. No more snow in the house!

In general we are headed rapidly in the right direction and morale is still high. Onward!