Showing posts with label snow. Show all posts
Showing posts with label snow. Show all posts

Saturday, February 11, 2012

Winter Sunshine

February 4: probably the nicest day of the year so far. We packed up the snowshoes and headed to the pass and up a mighty difficult trail. I was a little whiny due to the a lack of physical fitness. 

Here's the dynamic duo posing before a peak.

Sunday, January 25, 2009

Another Snowy Sunday

Laura and I had the pleasure of working in the house on another snowy Sunday here in Seattle. To say that we are looking forward to having insulation and a working furnace in the house is a bit of an understatement. The fact that our fireplace is now out of commission due to the gas piping that has been roughed in there leaves us with very few options. Our borrowed electric heater stands no chance against the icy grasp on our house. Based on the no parking signs on our street it appears that the public utility may actually get around to replacing our gas meter this week which is the lynch pin to our temperature woes. Then there will be heat...lots of heat.

We each spent yesterday not working on the bungalow, but still performing manual labor. Laura spent the day cleaning up the yard at the West Seattle house and shampooing the carpets. I worked with my family at clearing out my great uncle's barn in Issaquah from its collection of 80+ years worth of junk. My mom thought I was crazy for ordering three 20 yard dumpsters for trash, metal and wood debris. We quit working around 3:00 when they were all full. I also returned my dad's truck to him after I picked up the plywood that we needed, and we talked about the medicine cabinet that he is going to build for our main floor bathroom. We are fitting this new cabinet into a void space that we built out for ductwork and plumbing which is going to give us a lot of depth for this cabinet. It will be a great period feature to the house.
Today was a day of miscellaneous tasks, only a few of which were critical path items. We started out with a trip to Lynnwood (north of Seattle about 20 miles) to buy an electric hand planer I located on Craigslist. The original window frames in the house were installed somewhat haphazardly and the plaster installers made whatever was there work. Drywall will not be so forgiving so the plan is to plane the window frames down to be flush or lower than the drywall. Laura took a crack at it today and it seems that this method will work. As long as it is done by next Sunday night we will be ahead of the drywallers.

While Laura worked on the window frames, pulled some staples in the flooring and squirted expanding foam insulation around a few floor penetrations, I poured the concrete in the two holes in the basement which will take care of that tripping hazard and open up a little more floor space. I also got started on fixing some of the holes in the first floor that are not needed any longer, as well as fixing up the main floor bathroom walls. Laura and I finished up the day by installing the backing in the upstairs bathroom and pulling the old hardwood floor out of the shower in preparation for a new subfloor. A full weekend!
Me floating the floor back in where the old furnace chimney used to be.
A very small representation of the foam job Laura worked on.

A fine example of some of our scrap wood backing. Think towel bar.

Friday, December 19, 2008

Bid Day!

Well, the exclamation point isn't really suitable for what happened today: 2 bidders. It seems that the weather is going to stymie progress. Many of them rescheduled for next week and we might have a couple coming tomorrow. This doesn't sound too bad unless you take a look at the Seattle forecast which is calling for more snow, high winds and cold temperatures for at least the next 4 days. So, I'm not thinking conditions are going to be much better anytime soon.

We had planned to take the chimney down this weekend and have the roof patched but that's looking unlikely since the roof is pretty slippery and snow covered. Plus, the worst of it is that our dumpster pickup was rescheduled for Monday so we have a full dumpster going into the weekend! Uggh! I guess this is the part where renovation gets frustrating.

Thursday, December 18, 2008

Snow Day!

Ever wonder what your pets do when you're not home? We came home to this evidence on Monday night after spending our evening at the new house and not with the kittens. When the cats are away, the mice will play...

Demolition is still the number 1 chore and tonight we moved into the basement. This whole event was a bit tricky since it snowed about 8 inches in Seattle and the streets were in bad shape. Justin put chains on his car and we made our way, albeit slowly, over to Beacon Hill for our chance to fill up the dumpster (again!). Tomorrow is a big day for our project: bid day. Weather permitting, we'll have about a dozen contractors from various trades coming to walk through our house and give us an estimate of what it will take to do our projects. Justin is taking the day off of work to lead them through. We xeroxed a bunch of copies of our drawings and marked up the drawings to annotate our electrical outlet desires for the contractors to use in preparing their estimates. Justin has been diligently developing scopes of work for the bidders so we should be in good shape to get comprehensive quotes.

So the progress for tonight: we tore off the drywall (yeah! it's not plaster in the basement) in the front room and found a few surprises. First off, the person that "finished" the room used masking tape to finish the seams on the drywall. Second, we found a secret room. This is our first big find in the house if you don't count the dirty boy's underwear that was stashed in the attic.

Here's the front room with no drywall:


Here are some shots of the secret room, under the porch. Yes, that's more underwear you see. There are at least 2 women's slips down there, a bunch of scrap wood, some old, old boxes, a large basket, and a bunch of other things that I'll term as garbage.

A shot from the other direction:



And here's a less exciting photo of demolition in the back room. Amazingly, we found some insulation. This is it for the whole house and whomever installed it didn't do a first rate job. We found a 24" stud cavity with a 20" batt.


And, in other good news, we got our STFI Construction Permit on Wednesday. So, after we finish our demo, we're free to start construction!

Sunday, December 14, 2008

Demo Day IV & V

We made a ton of progress this weekend and are finally on the home stretch of demolition. Michelle & Ryan joined in the fun and helped us out on Saturday. Thanks R&M!



We spent the whole day smashing plaster and hauling lath and plaster out to the dumpster. Michelle and I were the primary haulers while Ryan and Justin got busy with the sledgehammers. We finished clearing the ceilings upstairs as well as the entire stairwell. By the end of Saturday we had the whole upstairs stripped down to the studs and all of the debris picked up and put in the dumpster. It was filthy, strenuous work!
Michelle and I had filth all over our faces at the end of the day. When I got in the shower that evening, the water ran gray through 2 shampoos.


Over night, our first snowfall of the season came and we woke up to about 2-3 inches of snow, an infrequent occurence in Seattle. It made driving from our house in West Seattle to Beacon Hill a little dicey due to the fact that Seattle doesn't own plows or salt the roads. But, we made it over the two big hills and back again safely.



Justin and I spent most of Sunday doing little details that wouldn't generate a lot of waste. I clipped all of the K&T wiring out of the first and second floors and unscrewed all of the recepticles in the living and dining rooms while Justin sawed off and capped the plumbing. We still have a functioning toilet which is mostly all I care about plumbing-wise. Ultimately, we wrapped up those tasks and took to removing the 700 billion nails from the studs. Each piece of lath is tacked onto the studs with two nails on either end and often two nails at each stud it crosses. When you pull off the lath, you usually pull a few nails with it but generally, you leave a bunch of nails behind. So, we spent about 2 hours pulling nails and still have about 250 billion nails left to go.


Here's Justin freezing his tush off extracting nails from the studs.