Monday, March 26, 2012
In the closet
Saturday, February 11, 2012
And the dust has settled
Sunday, January 29, 2012
We're at it again!
We had a structural engineer come out and look at our basement a few weeks ago to give us advice on how to properly earthquake-proof our house. Armed with plans for bracing and bracketing the joists and columns, Justin and I hit up the local Habitat for Humanity Home Store to search for all of the Simpson hardware that will shore up our home for "the big one". We found about 75% of the parts we need and buying by the pound at severe discounts is a nice perk. I'm really happy we checked out this store first.
This weekend, we took on a little demo and some temporary structures and boy does it feel good to have a project and see some forward progress on this basement. It is a little overwhelming to consider removing the insulation and re-routing ducts and piping to allow for an augmented layout for our basement but we'll be taking it slowly since we have no deadline driving this.
Sunday, March 21, 2010
A pile of rubble
Friday, March 19, 2010
Demolition Again!
Sunday, January 4, 2009
Final Days of Demo
A few of our subcontractors came out to the site to walk through. We had the framers and plumber on site to confer and our window & siding guy came by to take measurements with which to order our new windows. So far, we have these three subs on board. We'll be making some decisions on an electrician, HVAC contractor, insulator and drywaller this upcoming week. Tomorrow, the framers begin and if everything goes as planned (it's snowing buckets right now so this is a big "if"), we'll have our framing wrapped up before the end of this upcoming week.
The hallway and master bedroom and future linen closet. Our new bedroom door is moving over a couple of inches to give a more gracious opening.
Monday, December 29, 2008
Bye Bye Chimney
We're not sure how Santa fit his fat little self down this chimney throughout the years but he was decidedly happy that we left it up until the 26th so he could make one final delivery: a rotor-hammer that came with a free 4.5 inch angle grinder. We didn’t need to use either of these fancy new tools to deconstruct the chimney however, because it was held together by habit, not by mortar. The first 5 feet came down in 15 minutes and the last 25 feet were out of the house, cleaned and stacked in a tidy row in under 3 hours. Thanks to our work crew, Jill, Heidi, Aaron and Scott, many hands made light work (it was still heavy work but it went super fast!). Now I have all the makings for a new brick patio but we’re a long way off from a project like that.
We wrapped up the day by tearing out the drywall from one room in the basement—mostly Justin did this since I was pooped (that’s why this post is a day late). We have one more room to go in our deconstruction in the basement plus a good clean-up of the whole house before our demolition is final finished. Well, maybe there are a few other odds and ends but for the most part, that’s it.
Here's Jill chipping off the "mortar".
Scott posing in a very dusty room after the first floor of chimney was deconstructed.
Saturday, December 27, 2008
Another day in demolition
A shot of our hole before the patch.
Friday, December 26, 2008
Bid Day Redo
Seattle is still snowed under and the neighborhood streets are now all rutted out and very difficult to drive on. I didn't feel too great about driving up the street to run this errand so I walked. It was only a few blocks, but it was raining and the sidewalks are in sorry shape. I stopped by Delite Bakery for lunch which was the highlight of this cold and miserable day. The staff helped me pick out some delicious pastries for lunch (hombow, ham&cheese croissant, & empanda) and welcomed me to the neighborhood. I'll definitely be going back because their food is great and very inexpensive.
In the afternoon, Justin and I were both shivering in our boots and Justin got this great idea to build a fire in the fireplace. We have no shortage of kindling and dry, clean wood and we had a rip-roaring fire in no time. I figured if I pulled the nails from the trim pieces, I could sit in the living room in front of the fire and stay warm. The fire didn't heat up much of the rest of the house though. Justin got into the demo action a little in the afternoon as the stream of subcontractors slowed and pulled out a lot of the electrical wiring in the basement between the floor joists.
We're still waiting for it to warm up enough to melt the snow and ice on the roof and let us get up there to deconstruct the chimney. We want to be done with that by the 6th of January so our framing work can start. Tomorrow we'll have another big work day and hopefully even get onto the part where we vacuum up some of the dust. The dumpster is still full and the message is that *maybe* it will be picked up on Saturday but we aren't holding our breath.
Thursday, December 18, 2008
Snow Day!
So the progress for tonight: we tore off the drywall (yeah! it's not plaster in the basement) in the front room and found a few surprises. First off, the person that "finished" the room used masking tape to finish the seams on the drywall. Second, we found a secret room. This is our first big find in the house if you don't count the dirty boy's underwear that was stashed in the attic.
Sunday, December 14, 2008
Demo Day IV & V
Over night, our first snowfall of the season came and we woke up to about 2-3 inches of snow, an infrequent occurence in Seattle. It made driving from our house in West Seattle to Beacon Hill a little dicey due to the fact that Seattle doesn't own plows or salt the roads. But, we made it over the two big hills and back again safely.
Justin and I spent most of Sunday doing little details that wouldn't generate a lot of waste. I clipped all of the K&T wiring out of the first and second floors and unscrewed all of the recepticles in the living and dining rooms while Justin sawed off and capped the plumbing. We still have a functioning toilet which is mostly all I care about plumbing-wise. Ultimately, we wrapped up those tasks and took to removing the 700 billion nails from the studs. Each piece of lath is tacked onto the studs with two nails on either end and often two nails at each stud it crosses. When you pull off the lath, you usually pull a few nails with it but generally, you leave a bunch of nails behind. So, we spent about 2 hours pulling nails and still have about 250 billion nails left to go.
Sunday, December 7, 2008
Demo Day II
Justin capped off most of the plumbing so we can start ripping out fixtures and pipes and we cleaned out a problem gutter. The gutter was backed up and leaky and after disassembling it, we found a good 10 inches of muck and some plastic pieces plugging the passage. I also got rid of a bird's nest on the porch. It didn't appear to be occupied so I don't think any bird is going to miss it. Plus, I'm doing those birds a favor because my cats are fond of eating birds.
Saturday, December 6, 2008
Demo Day I
We had to pull all of the carpet out of the house and pry up the tack strips. Here's Jill finishing up the job.
The kitchen was our first victim to the sledgehammer. We had so much debris that we filled the 7 yard dumpster and had a bunch of the lath left over so we built a bonfire (not really) in the kitchen. We'll get rid of this pile when Waste Management frees us of the first load--thanks Ben @ WM for hooking us up.
Here's a view of the kitchen with most of the demo complete. We'll be opening up this wall a bit to make room for a peninsula from kitchen to the dining room but we're going to need some guidance from our architect on how to frame it out properly.